DAY 1

What We Do

  • Please have everything within a 50’ radius out of the way (move furniture, cover plant beds, take down string lights, etc.).

  • Our foreman will meet with you if you are home and walk through the project with you.

  • If you are not home for the walk-through we just ask that you check the forms when you are home that night.

  • Remove any fence posts, landscaping or any other sort of obstruction in the way that you have discussed with your sales contact.

  • Use a plywood machine path and remove any concrete, deck, pavers or other material that needs to be removed using a front loader.

  • Set the forms of your project and compact a 4” base of limestone or recycled crushed concrete.

  • If you are having piers installed, they will drill down below the frost line and set 6” pipe for the piers.

  • If anything needs tweaked, please let us know by 9pm that night.